Lake County is being asked to host 1.2 gigawatts

The T5 campus proposed for Peterson Road in Grayslake would draw more electricity in a year than every household in Lake County combined. We are neighbors asking for the engineering, the water numbers and the tax terms to be public before anything else is approved.

1.2 GWProposed campus electrical load
6.3 TWhAnnual electricity at 60% utilization
468Standby diesel generators at 3.25 MW each
Coalition seal: waterfowl flying over Lake County marsh, ringed by the words Lake County IL Data Center Opposition Coalition.

What is on the table

Proposals we are tracking

One row per application, updated after each public meeting. If a filing is missing from this table, tell us and we will add it.

Status reflects the most recent public action by the relevant board. Rows marked Example show the format only — replace them with confirmed filings before publishing.
Site Proposed load Status Next public date
T5 CampusPeterson Road, Grayslake 1.2 GW Approved by Village Board
Second site ExampleMunicipality, Lake County Zoning hearing scheduled
Third site ExampleMunicipality, Lake County Application withdrawn

Not a bigger version of the same thing

What a hyperscale campus actually is

Both are called data centers. One runs your inbox, your feed and your streaming queue. The other trains AI models. They are not the same building at different sizes.

Compared with a 30 MW conventional data center, hyperscale campuses use or produce:

40×the electrical load
16×the power per rack
40×the waste heat
51×the standby diesel

Calculated from stated facility ratings at 60% utilization and a power usage effectiveness of 1.25. The 30 MW facility is a representative example, not a specific building. Where the real configuration differs these numbers should be corrected — we would welcome the engineering plans that would allow it.


How the coalition works

Four things we do, in public

Put it on the record

We file written comment before every hearing, so the questions and the answers both survive in the minutes rather than in a hallway conversation.

Check the engineering

Load, water withdrawal, generator emissions and noise are all measurable. We publish our sources and our arithmetic, and we correct ourselves when we get one wrong.

Organize the neighbors

Turnout at a village board meeting decides more than any website does. We tell you which room, which night, and what to say when you get three minutes.

Hold officials to the terms

Incentives, road agreements and water permits carry conditions. We track whether what was promised at approval is what actually gets built.


Read it yourself

Documents and handouts

Everything we hand out at a meeting is downloadable here, with its sources printed on the page. Nothing on this site asks you to take our word for it.


Take action

Stand with your neighbors

The list is ours. We do not sell it, we do not share it, and every message comes from a person on this coalition.

Roughly one message every two weeks, plus a short alert the week before any public hearing. Unsubscribe link in every message.

Or do one of these this week

  1. 1

    Speak for three minutes

    Public comment is open at every village board meeting. Say where you live, name one specific concern, and stop. Brevity carries.

  2. 2

    Write your trustee

    One paragraph in your own words outweighs a hundred identical form letters. We will send you the current addresses.

  3. 3

    Put a sign in your yard

    Signs are how a neighbor who has heard nothing finds out there is something to hear about.